6 - WORKING OPERATIONS
7. Line up the nine holes on each side of the tunnel with
the holes in the frame. Assemble the nine bolts
(1)
to each side of the tunnel (between the tunnel support
pipes
(2)
). The bottom four on each side have spacers
to the inside. Be sure to position the spacers between
the tunnel and the frame (spacers not shown) Secure
in place with the hardware saved from removal. Lower
four bolts shown.
RAIL16GEN0099AA
37
8. Assemble the three allen head bolts — early produc-
tion or hex head bolts — current production (saved
from removal) at the driven end of the rotor on the feed
table side. These bolts hold the tunnel to the frame
and are in line with the rotor. Tighten securely.
RAIL16GEN0096AA
38
9. Assemble the guard over the chains at the driven end
of the rotor. Secure in place with the hardware saved
from removal. Tighten securely.
RAIL16GEN0097AA
39
10. Assemble the three allen head bolts — early produc-
tion or hex head bolts — current production (saved
from removal) at the planetary end of the rotor on the
feed table side. These bolts hold the tunnel to the
frame and are in line with the rotor. Tighten securely.
RAIL16GEN0096AA
40
6-16
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...