6 - WORKING OPERATIONS
10. Remove the seven 3/4” bolts
(1)
from under the tun-
nel. These bolts hold the tunnel to the frame. Three
are on the cab end of the tunnel and four
(2)
are on
the engine end of the tunnel. Save the hardware for
reassembly
RAIL16GEN0093AA
21
RAIL16GEN0091AA
22
11. Remove the guard
(1)
from the planetary end of the
rotor on the feed table side. This is to access the
three allen flat head bolts
(2)
(inline with the rotor) that
hold the tunnel to the frame. Remove all three bolts.
Save all hardware for reassembly. Early production
had flat head bolts, current production has hex head
bolts.
RAIL16GEN0095AA
23
RAIL16GEN0096AA
24
6-11
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...