6 - WORKING OPERATIONS
3.
Position the right side tunnel mount
(2)
on the cab end of the tunnel, with the narrow lip between the tunnel tubes
and the other mounting lip pointing away from the tunnel.
4.
Secure the mount to the tunnel with a mount backing bar with nuts
(4)
positioned on the inside surface of the
tunnel. Secure the mount to the tunnel with 5/8-11 x 2 bolts and 5/8 SAE flat washers.
(5)
5.
Secure the left side tunnel mount
(3)
to the engine end of the tunnel in the same manner.
6.
Lift the tunnel up with the overhead hoist and position on the bagger frame.
7.
Insert the threaded tunnel bottom mounting plates
(6)
into the pockets in the frame.
8.
Lower the tunnel down and line up the holes in the mounting brackets
(7)
on each end of the tunnel with the
threaded holes in the tunnel mount plates.
9.
Insert the 5/8-11 x 2 bolts with 5/8 SAE flat washers
(8)
through the bracket and into the threaded holes. Tighten
securely.
10. Assemble the 5/8-11 x 1-1/2 hex head bolts and the 5/8-11 x 2 socket head screws to the cab end and engine
end frame mounting plates. Secure in place with 5/8-11 nylon lock flange nuts. The outer mounting holes from
the 14 ft tunnel to the frame will not be used for the 12 ft tunnel.
11. Assemble the tunnel support weldment plates between the left and right tunnel mounts and the corresponding
holes in the frame of the bagger on the engine and cab ends. Use 5/8-11 x 1-1/2 hex bolts 5/8-11 nylon lock
flange nuts to secure the weldments to the tunnel mounts and the frame. On the cab end of the tunnel, also
assemble the anchor indicator cable roller to the lower bolt of the tunnel mount. Tighten securely.
12. Assemble the tunnel support weldment plates between the left and right tunnel mounts and the corresponding
holes in the frame of the bagger on the engine and cab ends. Use 5/8-11 x 1-1/2 hex bolts 5/8-11 nylon lock
flange nuts to secure the weldments to the tunnel mounts and the frame. On the cab end of the tunnel, also
assemble the anchor indicator cable roller to the lower bolt of the tunnel mount. Tighten securely.
RAIL16GEN0271FA
2
6-5
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...