G 01157 - Edition 03 - Januar
y 10
1/1
E 010
ADP/ADS Exchange standard repair
Presentation of
ADP/ADS exchange
standard repair
ADP/ADS exchange standard repair has been detailed into several
key steps.
These are detailed in specific sheets as listed below.
The key steps must be followed in chronological order:
Preliminary precautions ...............................................
E 011
Draining of the water cooling circuit ..........................
E 012
Saving of the pump configuration .................................
E 013
Disconnecting the pump from the installation ..................
E 014
Shipping procedure for contaminated pumps ..................
E 015
Safety questionnaire ...................................................
G 200
Installing a new pump ......................................
B 000 to B130
Remote loading of pump configuration .........................
C 44
adixen Vacuum Products - Operating instructions - ADP/ADS Series Two