![ACS S10 Series Скачать руководство пользователя страница 20](http://html2.mh-extra.com/html/acs/s10-series/s10-series_manual_3046903020.webp)
Chapter 4 Installation
S10 Screenless Granulator 882.12058.00
• 05-01-2019 15
This chapter describes step-by-step procedures for installing the unit.
DANGER
Do not tip over the granulator, since it is very heavy.
When moving the equipment, watch for cracks, stairs, or inclines to
prevent tipping. Please be extremely careful. Injuries including fractures
will result if caught under the equipment.
Place an iron plate when there is a ditch-plate or a hole in the movement
path.
CAUTION
Be sure to lock the two casters, except when moving the equipment.
Step
Item
Description
1
Installation of
equipment
Install the equipment on a stable, level floor.
Ensure that there’s enough perimeter space for maintenance, and so that the feed
hopper can be tilted open for cleaning, checks, etc.
2
Locking the casters
Be sure to lock the two casters as shown in Fig.4-1.
Fig. 4-1
3
Preparation for primary
power
Confirm the rated voltage indicated on the nameplate of the equipment.
Then, connect to an outlet for the rated voltage, or power supply source.
Содержание S10 Series
Страница 3: ......
Страница 47: ...Chapter 11 General Drawing S10 Screenless Granulator 882 12058 00 05 01 2019 42 S10...
Страница 49: ...S10 Screenless Granulator 882 12058 00 05 01 2019 44...