42/23-81 EN Rev. 4
System Manual SCK Gas Sampling System
103
Installing the cooling water circuit
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the operator.
The location of the connections on the various modules can be found in the pneu-
matic/hydraulic interface plan in the appendix. All required lines are pre-installed in
the probe retractor area. All downline connections as connected from the central
connection point on top of the probe retractor.
Pneumatic/hydraulic interface plan
Hose
clamps
Prepare the cooling-water hoses as follows:
Step Procedure
1
After assembling the probe retractor and cooling module, determine
the length of the cooling-water hoses.
2
Cut the cooling-water hoses to length.
3
Insert screw connectors into the ends of the hoses and secure with
hose clamps.
Install the cooling-water hoses as follows:
Step Procedure
1
Lay and fasten cooling-water hoses along designated path.
2
Connect cooling-water hoses to the module screw connectors as
per the pneumatic/hydraulic interface plan in the appendix.
Observe the following rules:
Install cooling-water hoses so as to rule out any damage caused by working in
the proximity of the gas sampling system. ABB recommends installing tubes on
trays or in tube conduits.
Minimum bending radius of the cooling-water hoses is 160 mm. If this is not
possible for technical reasons, ABB recommends installing suitable pipe adapt-
ers.
Mechanical, thermal
and material dangers
Position of the
connections
Required documents
Tools required
Preparation
Installing the cooling-
water hoses
Installing tubes
Содержание SCK
Страница 2: ......
Страница 16: ......
Страница 36: ......
Страница 54: ......
Страница 110: ......
Страница 222: ......
Страница 232: ......
Страница 234: ...234 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Pneumatic hydraulic interface plan ...
Страница 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Страница 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Страница 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Страница 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Страница 242: ......
Страница 243: ......