206
System Manual SCK Gas Sampling System
42/23-81 EN Rev. 4
Cooling module: Vent the cooling-water circuit
every six months (or as required)
Always take the following safety measures when performing this work:
Wear the general protective equipment.
Turn the service switch to
ON
and secure the service switch against unauthor-
ized switching (with a padlock).
Only specialized electrical personnel may work on the electrical system.
Do not perform work on the cooling-water circuit until the cooling water has
cooled down.
Avoid contact with the cooling water and the anti-freeze.
Wash any cooling water and anti-freeze off the skin immediately with water and
soap.
If cooling water or anti-freeze gets in the eyes despite protective glasses, rinse
them thoroughly under running water, holding the eyelids open.
Observe instructions in the anti-freeze manufacturer's safety data sheet.
Always keep the floor around the gas sampling system clean and dry.
Explanation of safety measures:
Safety regulations for maintenance work on page
156.
Control cabinet key to open the control cabinet
The service switch is in the
ON
position, the gas sampling probe is retracted from
the kiln (see
Operating the service switch
on page 159).
Proceed as follows to vent the cooling-water circuit:
Step Procedure
1
Open the control cabinet.
2
After retracting the probe wait until cooling-water temperature has
dropped to 40 °C; you can monitor this on the controller:
Path:
Diagnosis
►
Trends
►
Cooling Water Return Temperature
Maintenance interval
Safety
measures
Tools required
Requirements
Instructions
Содержание SCK
Страница 2: ......
Страница 16: ......
Страница 36: ......
Страница 54: ......
Страница 110: ......
Страница 222: ......
Страница 232: ......
Страница 234: ...234 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Pneumatic hydraulic interface plan ...
Страница 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Страница 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Страница 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Страница 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Страница 242: ......
Страница 243: ......