6
System Manual SCK Gas Sampling System
42/23-81 EN Rev. 4
Probe retractor: Checking and tightening the drive chain ..................................... 196
Probe retractor: Checking and, if necessary, adjusting the position of the probe . 198
Probe retractor: Checking and, if necessary, adjusting the position indicator
(probe end position) ............................................................................................... 202
Probe retractor: Checking the bellows .................................................................. 205
Cooling module: Vent the cooling-water circuit ..................................................... 206
Cooling module: Checking and topping up cooling water ..................................... 208
Pneumatic system: Replacing the compressed-air filter ....................................... 211
Chapter 10
Errors .................................................................................................................... 213
Errors and irregularities ......................................................................................... 214
Touchscreen error displays .................................................................................... 216
Handling error messages ...................................................................................... 221
Chapter 11
Shutting down, storing, putting back into operation, disposal ...................... 223
Shutting down the system ..................................................................................... 224
Disassembling the system ..................................................................................... 227
Storing the system ................................................................................................. 229
Putting the system back into operation ................................................................. 230
Disposing of the system ........................................................................................ 231
Chapter 12
Appendix .............................................................................................................. 233
Pneumatic/hydraulic interface plan........................................................................ 234
Electrical connection plan ...................................................................................... 236
Transformer connection plan ................................................................................. 238
Index 239
Содержание SCK
Страница 2: ......
Страница 16: ......
Страница 36: ......
Страница 54: ......
Страница 110: ......
Страница 222: ......
Страница 232: ......
Страница 234: ...234 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Pneumatic hydraulic interface plan ...
Страница 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Страница 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Страница 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Страница 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Страница 242: ......
Страница 243: ......