42/23-81 EN Rev. 4
System Manual SCK Gas Sampling System
101
Installing the cooling module
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the operator.
Danger of crushing when lifting or lowering the transport unit
Only appropriately trained personnel may transport the transport units and only
with the aid of the recommended transport equipment.
Do not stand under suspended loads.
Follow the transport instructions in these operating instructions carefully.
4 galvanized steel screws (or stainless material) M12x30 or bolts M12x30
The following requirements must be met in order to install the cooling module:
The site conforms to the designated site conditions (criteria see
Choosing the
place of installation of the peripheral modules
).
Fastening points are present to affix the cooling module.
The cooling module is unpacked.
Mechanical, thermal
and material dangers
Heavy transport units
Screws required for
assembly
Requirements
Содержание SCK
Страница 2: ......
Страница 16: ......
Страница 36: ......
Страница 54: ......
Страница 110: ......
Страница 222: ......
Страница 232: ......
Страница 234: ...234 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Pneumatic hydraulic interface plan ...
Страница 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Страница 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Страница 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Страница 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Страница 242: ......
Страница 243: ......