210
System Manual SCK Gas Sampling System
42/23-81 EN Rev. 4
Step Procedure
7
Open shut-off valve
-J63
and allow cooling water to flow in slowly
until bubble-free cooling water appears at the heat exchanger drain
valve.
8
Close shut-off valve
-J63
.
9
Close vent cock on heat exchanger, screw on cap.
10
Open shut-off valve
-J63
again slowly and observe cooling-water
pressure display on the touchscreen. Fill cooling water to a pres-
sure of 1-1.5 bar (1000-1500 hPa).
Note:
It is advisable for two people to do this job.
11
Switch the cooling-water pump
-M51
on again at motor breaker
-
F37
or circuit breaker
-F36
.
12
Close control cabinet again.
13
Turn service switch back to
OFF
position and insert probe again
using the controller.
WARNING!
Probe moves into the kiln.
Do not stand in the area of
travel of the probe or probe carriage until the probe is com-
pletely inserted into the kiln and the warning lamps go out.
Содержание SCK
Страница 2: ......
Страница 16: ......
Страница 36: ......
Страница 54: ......
Страница 110: ......
Страница 222: ......
Страница 232: ......
Страница 234: ...234 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Pneumatic hydraulic interface plan ...
Страница 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Страница 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Страница 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Страница 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Страница 242: ......
Страница 243: ......