function (SINGLECMD) is then checked from the local HMI by applying the
commands with
Mode
=
Off
,
Steady
or
Pulse
, and by observing the logic statuses of
the corresponding binary output. Command control functions included in the
operation of different built-in functions must be tested at the same time as their
corresponding functions.
10.8
Logic
10.8.1
Tripping logic, common 3-phase output SMPPTRC
Prepare the IED for verification of settings outlined in section
.
This function is functionality tested together with other protection functions (line
differential protection,earth-fault overcurrent protection, and so on) within the IED. It
is recommended that the function is tested together with the autorecloser function,
when built into the IED or when a separate external unit is used for reclosing purposes.
The instances of SMPPTRC are identical except for the name of the function block
SMPPTRC. The testing is preferably done in conjunction with the protection system
and autoreclosing function.
10.8.1.1
Three-phase operating mode
1.
Check that
AutoLock
and
TripLockout
are both set to
Off
.
2.
Initiate a three-phase fault.
An adequate time interval between the faults should be considered, to overcome
a reclaim time caused by the possible activation of the Autorecloser function
SMBRREC. The function must issue a three-phase trip in all cases, when trip is
initiated by any protection or some other built-in or external function. The
following functional output signals must always appear simultaneously: TRIP,
TRL1, TRL2, TRL3 and TR3P.
10.8.1.2
1ph/3ph operating mode
In addition to various other tests, the following tests should be performed. They
depend on the complete configuration of an IED:
Procedure
1.
Make sure that
TripLockout
and
AutoLock
are both set to
Off
.
2.
Initiate different single-phase-to-earth faults one at a time.
Single-phase tripping will only be allowed when an autoreclose attempt will
follow. The autorecloser function SMBRREC has the functionality such as the
long trip time, CB ready and so on, which can prevent a proper single-phase
tripping and autoreclose. To by-pass this problem the fault initiation should be
1MRK 504 160-UEN -
Section 10
Testing functionality by secondary injection
Transformer protection RET650 2.1 IEC
89
Commissioning manual
Содержание RET650 2.1 IEC
Страница 1: ...Relion 650 series Transformer protection RET650 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 24: ...18 ...
Страница 32: ...26 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 72: ...66 ...
Страница 110: ...104 ...
Страница 116: ...110 ...
Страница 125: ...119 ...