Enable forcing by using LHMI................................................ 59
Enable forcing using TESTMODE function block...................60
How to change binary input/output signals using forcing............ 60
Forcing by using LHMI........................................................... 60
Forcing by using PCM600...................................................... 62
How to undo forcing changes and return the IED to normal
operation......................................................................................64
Section 10 Testing functionality by secondary injection...................67
Testing disturbance report................................................................67
Introduction..................................................................................67
Disturbance report settings..........................................................67
Disturbance recorder (DR).......................................................... 67
Event recorder (ER) and Event list (EL)...................................... 68
Transformer differential protection T3WPDIF..............................69
Verifying the settings.............................................................. 69
Completing the test................................................................ 70
Restricted earth-fault protection, low impedance REFPDIF .......70
Verifying the settings.............................................................. 70
Completing the test................................................................ 71
Current protection.............................................................................71
Instantaneous phase overcurrent protection 3-phase output
PHPIOC ......................................................................................71
Measuring the operate limit of set values...............................71
Completing the test................................................................ 72
Four step phase overcurrent protection 3-phase output
OC4PTOC................................................................................... 72
Verifying the settings.............................................................. 72
Completing the test................................................................ 73
Instantaneous residual overcurrent protection EFPIOC .............73
Four step residual overcurrent protection, (Zero sequence or
negative sequence directionality) EF4PTOC ..............................74
Four step directional earth fault protection............................. 74
Four step non-directional earth fault protection......................75
Completing the test................................................................ 75
Thermal overload protection, two time constants TRPTTR ........75
Checking operate and reset values........................................75
Table of contents
Transformer protection RET650 2.1 IEC
3
Commissioning manual
Содержание RET650 2.1 IEC
Страница 1: ...Relion 650 series Transformer protection RET650 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 24: ...18 ...
Страница 32: ...26 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 72: ...66 ...
Страница 110: ...104 ...
Страница 116: ...110 ...
Страница 125: ...119 ...