The IED will restart after confirmation. Menu items
LANAB:1
and
LANCD:1
are hidden in local HMI after restart but are visible in PST
where the values for parameter
Mode
is set to
Duo
.
8.3
Verifying the communication
To verify that the communication is working a test/analyzing tool, for example
ITT600, can be used.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on both port AB and CD. Browse in
the local HMI to
Main menu/Diagnostics/Communication/Redundant PRP
and
check that both signals LAN-A-STATUS and LAN-B-STATUS are shown as
Ok
.
Remove the optical connection to one of the ports AB or CD. Verify that either signal
LAN-A-STATUS or LAN-B-STATUS (depending on which connection that was
removed) are shown as
Error
and the that other signal is shown as
Ok
. Be sure to re-
connect the removed connection after completed verification.
Section 8
1MRK 504 160-UEN -
Establishing connection and verifying the IEC 61850 communication
52
Transformer protection RET650 2.1 IEC
Commissioning manual
Содержание RET650 2.1 IEC
Страница 1: ...Relion 650 series Transformer protection RET650 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 24: ...18 ...
Страница 32: ...26 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 72: ...66 ...
Страница 110: ...104 ...
Страница 116: ...110 ...
Страница 125: ...119 ...