Gas medium supervision SSIMG................................................ 92
Testing the liquid medium supervision for alarm and lock
Liquid medium supervision SSIML.............................................. 93
Testing the liquid medium supervision for alarm and lock
out conditions......................................................................... 93
Completing the test................................................................ 94
Breaker monitoring SSCBR.........................................................94
Verifying the settings.............................................................. 94
Completing the test................................................................ 96
Completing the test................................................................ 97
ETPMMTR...................................................................................97
Verifying the settings.............................................................. 97
Completing the test................................................................ 98
Station communication..................................................................... 99
Multiple command and transmit MULTICMDRCV /
MULTICMDSND..........................................................................99
Basic IED functions.......................................................................... 99
Parameter setting group handling SETGRPS............................. 99
Verifying the settings.............................................................. 99
Completing the test.............................................................. 100
Exit test mode.................................................................................100
Section 11 Checking the directionality........................................... 101
Section 12 Commissioning and maintenance of the fault
clearing system............................................................ 105
Preparation...........................................................................106
Recording............................................................................. 107
Secondary injection.............................................................. 107
Alarm test............................................................................. 107
Self supervision check..........................................................107
Trip circuit check.................................................................. 107
Table of contents
Transformer protection RET650 2.1 IEC
5
Commissioning manual
Содержание RET650 2.1 IEC
Страница 1: ...Relion 650 series Transformer protection RET650 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 24: ...18 ...
Страница 32: ...26 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 72: ...66 ...
Страница 110: ...104 ...
Страница 116: ...110 ...
Страница 125: ...119 ...