10.9.5.1
Completing the test
Continue to test another function or end the test by changing the Test mode setting to
Off
. Restore connections and settings to their original values, if they were changed for
testing purposes.
10.10
Metering
10.10.1
Pulse-counter logic PCFCNT
The test of the Pulse-counter logic function PCFCNT requires the Parameter Setting
tool in PCM600 or an appropriate connection to the local HMI with the necessary
functionality. A known number of pulses with different frequencies are connected to
the pulse counter input. The test should be performed with settings
Operation
=
On
or
Operation
=
Off
and the function blocked or unblocked. The pulse counter value is
then checked in PCM600 or on the local HMI.
10.10.2
Function for energy calculation and demand handling
ETPMMTR
Prepare the IED for verification of settings as outlined in section ”Overview “ and
section ”Preparing for test“ in this chapter.
10.10.2.1
Verifying the settings
Common test equipment can be used to determine the injection of current and voltage
and time measurement.
Verification of EAFACC & ERFACC output
1. Connect the test set for injection of three-phase currents and three phase voltage
to the appropriate current and voltage terminals of the IED.
2. Ensure the instantaneous values of active and reactive power from CVMMXN
function block are connected to ETPMMTR function block active and reactive
power inputs.
3. Enable the
EnaAcc
setting and set
tEnergy
as 1 minute.
4. Activate the
STARTACC
input and supply the IED with three phase currents and
voltages at their rated value.
5. Check that the
ACCINPRG
signal appears continuously.
6. Note the
EAFACC
and
ERFACC
value after 1 minute and compare it with
calculated energy value.
7. Similarly check after each 1 minute whether the calculated integrated energy
value and
EAFACC
and
ERFACC
outputs are matching.
8. After some time (multiple of minute) remove the current and voltage input from
CVMMXN function block.
1MRK 504 160-UEN -
Section 10
Testing functionality by secondary injection
Transformer protection RET650 2.1 IEC
97
Commissioning manual
Содержание RET650 2.1 IEC
Страница 1: ...Relion 650 series Transformer protection RET650 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 24: ...18 ...
Страница 32: ...26 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 72: ...66 ...
Страница 110: ...104 ...
Страница 116: ...110 ...
Страница 125: ...119 ...