Testing the liquid medium supervision for level alarm
and level lockout conditions................................................. 162
Testing the liquid medium supervision for temperature
Breaker monitoring SSCBR.......................................................163
Verifying the settings............................................................ 164
Completing the test.............................................................. 165
Limit counter L4UFCNT.............................................................167
Completing the test.............................................................. 168
ETPMMTR.................................................................................168
Verifying the settings............................................................ 168
Completing the test.............................................................. 170
Station communication................................................................... 170
Multiple command and transmit MULTICMDRCV /
MULTICMDSND........................................................................170
Basic IED functions........................................................................ 170
Parameter setting group handling SETGRPS........................... 170
Verifying the settings............................................................ 170
Completing the test.............................................................. 171
Exit test mode.................................................................................171
Section 10 Checking the directionality........................................... 173
Section 11 Commissioning and maintenance of the fault
clearing system............................................................ 177
Preparation...........................................................................178
Recording............................................................................. 179
Secondary injection.............................................................. 179
Alarm test............................................................................. 179
Self supervision check..........................................................179
Trip circuit check.................................................................. 179
Table of contents
Line distance protection REL650 2.2 IEC
7
Commissioning manual
Содержание REL650 series
Страница 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Страница 2: ......
Страница 24: ...18...
Страница 28: ...22...
Страница 38: ...32...
Страница 54: ...48...
Страница 58: ...52...
Страница 178: ...172...
Страница 182: ...176...
Страница 188: ...182...
Страница 196: ...190...
Страница 206: ...200...
Страница 207: ...201...