Two step residual overvoltage protection ROV2PTOV ............ 125
Frequency protection......................................................................126
Underfrequency protection SAPTUF ........................................126
Verifying the settings............................................................ 126
Completing the test.............................................................. 128
Overfrequency protection SAPTOF ..........................................128
Verifying the settings............................................................ 128
Completing the test.............................................................. 129
Rate-of-change frequency protection SAPFRC ........................129
Verifying the settings............................................................ 129
Completing the test.............................................................. 130
Secondary system supervision.......................................................130
Current circuit supervision CCSSPVC.......................................130
Fuse failure supervision FUFSPVC...........................................130
Checking that the binary inputs and outputs operate as
function ................................................................................131
Measuring the operate value for the zero-sequence
function.................................................................................133
Checking the operation of the du/dt and di/dt based
function ................................................................................134
Completing the test.............................................................. 135
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................. 135
Testing the synchronizing function....................................... 136
Testing the synchrocheck functionality.................................137
Testing the energizing check................................................139
Testing the voltage selection................................................141
Completing the test.............................................................. 141
Autorecloser for 1/2/3-phase operation SMBRREC ................. 141
Preparation of the verification ..............................................143
Switching the auto recloser to On and Off
Verifying the auto recloser ...................................................144
Checking the auto reclosing conditions................................145
Table of contents
Line distance protection REL650 2.2 IEC
5
Commissioning manual
Содержание REL650 series
Страница 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Страница 2: ......
Страница 24: ...18...
Страница 28: ...22...
Страница 38: ...32...
Страница 54: ...48...
Страница 58: ...52...
Страница 178: ...172...
Страница 182: ...176...
Страница 188: ...182...
Страница 196: ...190...
Страница 206: ...200...
Страница 207: ...201...