4.
Also, reduce the liquid level input below
LevelLOLimit
or activate the binary
input signal
SENLVLLO
, check that
LVLLO
signal after a set time delay of
tLevelLockOut
.
5.
Activate
BLOCK
binary input and check that the outputs
LVLALM
,
LVLLO
,
ALARM
and
LOCKOUT
disappears.
6.
Reset the
BLOCK
binary input.
7.
Make sure that level lockout condition exists and then activate the reset lock
out input
RESETLO
and check that the outputs
PRESLO
and
LOCKOUT
reset.
9.11.2.2
Testing the liquid medium supervision for temperature alarm and
temperature lock out conditions
GUID-189AF20B-D0E3-453D-A787-68F25D0903D3 v1
1.
Consider the analogue temperature input
SENTEMP
and set
SENTEMP
to a
value higher than
TempAlarmLimit
, check that outputs
TEMPALM
and
ALARM
are activated after a set time delay of
tTempAlarm
.
2.
Temperature lockout input
SETTLO
can be used to set
TEMPLO
signal.
3.
Also, increase further the temperature input above
TempLOLimit
, check that
the outputs
TEMPLO
and
LOCKOUT
appears after a set time delay of
tTempLockOut
.
4.
Activate
BLOCK
binary input and check that the outputs
TEMPALM
,
TEMPLO
,
ALARM
and
LOCKOUT
disappear.
5.
Reset the
BLOCK
binary input.
6.
Make sure that temperature lockout condition exists and then activate the
reset lock out input
RESETLO
and check that the outputs
TEMPLO
and
LOCKOUT
reset.
9.11.2.3
Completing the test
GUID-1A0D8AF0-4C48-45E8-B31D-96734ED1A4D2 v1
Continue to test another function or end the test by changing the
TestMode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
9.11.3
Breaker monitoring SSCBR
GUID-10D26C82-79FF-4EAD-AE4A-2F2DBE965087 v2
Prepare the IED for verification of settings outlined in section “Testing the IED
operation”.
The Signal Monitoring tool in PCM600 shows the service values that are available
on the Local HMI as well.
Values of the logical signals belong to the breaker monitoring are available on the
local HMI under:
Main menu/Test/Function status/Monitoring/
BreakerMonitoring/SSCBR:x
1MRK 506 383-UEN A
Section 9
Testing functionality by secondary injection
Line distance protection REL650 2.2 IEC
163
Commissioning manual
Содержание REL650 series
Страница 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Страница 2: ......
Страница 24: ...18...
Страница 28: ...22...
Страница 38: ...32...
Страница 54: ...48...
Страница 58: ...52...
Страница 178: ...172...
Страница 182: ...176...
Страница 188: ...182...
Страница 196: ...190...
Страница 206: ...200...
Страница 207: ...201...