![ABB Robotics IRB 6790 Скачать руководство пользователя страница 216](http://html1.mh-extra.com/html/abb-robotics/irb-6790/irb-6790_product-manual_450837216.webp)
Note
Action
Screws: 4 pcs.
xx1700002155
Fit the SMB/BU cover in its hole with the
attachment screws from inside the SMB
recess without damaging the o-ring.
Note
Do not tighten the screws fully! It must still
be possible to adjust the position of the
cable harness by rotating the SMB/BU
cover in its hole a little.
4
xx1300000593
Adjust the cables running through the hole
in the frame by carefully moving the
SMB/BU cover on its screws, while at the
same time checking the position of the
cable harness through the hole.
Note
The cables must be placed so that they
don't rub against any part of the robot.
5
Screws: 4 pcs.
xx1700002155
Secure the SMB/BU cover with its attach-
ment screws from inside the SMB/BU re-
cess.
6
Continues on next page
216
Product manual - IRB 6790
3HAC063331-001 Revision: B
© Copyright 2019 - 2020 ABB. All rights reserved.
4 Repair
4.4.2 Refitting the cable harness
Continued
Содержание IRB 6790
Страница 1: ...ROBOTICS Product manual IRB 6790 ...
Страница 2: ...Trace back information Workspace 20A version a8 Checked in 2020 03 09 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 38: ...This page is intentionally left blank ...
Страница 164: ...This page is intentionally left blank ...
Страница 612: ...This page is intentionally left blank ...
Страница 638: ...This page is intentionally left blank ...
Страница 644: ...This page is intentionally left blank ...
Страница 658: ...This page is intentionally left blank ...
Страница 660: ...This page is intentionally left blank ...
Страница 667: ......