3.3.13 Inspecting the leak flow (overpressure unit) in the system
General
There is a constant overpressure and leak flow in the Foundry Prime system, to
avoid dirt or chemicals inside the robot. It is necessary to check the overpressure
every 12 month to ensure correct function.
Inspection points
The following points on the robot must be inspected.
xx1700001382
Motor cover axis 1
A
Battery cover
B
Motor cover axis 2
C
Motor cover axis 3
D
Motor cover axis 4
E
Motor cover axis 6
F
Connection to balancing device
G
Continues on next page
128
Product manual - IRB 6790
3HAC063331-001 Revision: B
© Copyright 2019 - 2020 ABB. All rights reserved.
3 Maintenance
3.3.13 Inspecting the leak flow (overpressure unit) in the system
Содержание IRB 6790
Страница 1: ...ROBOTICS Product manual IRB 6790 ...
Страница 2: ...Trace back information Workspace 20A version a8 Checked in 2020 03 09 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 38: ...This page is intentionally left blank ...
Страница 164: ...This page is intentionally left blank ...
Страница 612: ...This page is intentionally left blank ...
Страница 638: ...This page is intentionally left blank ...
Страница 644: ...This page is intentionally left blank ...
Страница 658: ...This page is intentionally left blank ...
Страница 660: ...This page is intentionally left blank ...
Страница 667: ......