According to this logic, the energy vector exchanges with the grid are cancelled and the 9 kW requested by
the utility are met in part by the photovoltaic production and in part by the batteries.
This configuration can be used when the installer deems it appropriate that the system manages the energy
storage according to a global logic of a three-phase system, which takes into account the production and
consumption on all phases.
Therefore, this configuration is recommended when the three phases supply power to all the loads of a
house without a clear distinction, or when you want the energy balance of the storage system to cover all the
phases of the system (e.g. if one phase feeds the apartment, the second feeds the garden and the third feeds
the garage).
Figure 42 – Example of power flows in a 3000SP storage inverter on a three-phase system