30 / 121
User Manual 3000SP
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 16/03/2021 - Application: GID
Figure 24 – Connecting the CT cables for the current sensors
3)
Unscrew the 4 screws (A) of the central cover with a star screwdriver (figure 24).
4)
Remove the waterproof cover (B), loosen the cable gland (C), and then remove the stopper (G).
5)
Route the CT cable through the cable gland to the right of the cover, connect the cable to the CT
terminal supplied, then insert the CT terminals into the corresponding ports (CTa for the exchange
sensor and CTpv for the production sensor).
6)
If using Pylontech batteries, the communication cable between the inverter and batteries is supplied
as an accessory inside the transparent bag in the inverter’s packaging. For WeCo batteries, the cable
is found inside the battery packaging.
Connect one terminal to the battery (BAT), and the other to the inverter (inverter).
Route the communication cable (inverter side) through the cable gland on the left side of the cover,
then insert the connector into the CAN port. Insert the battery-side connector (BAT end) into the
CAN port of the PYLONTECH or WeCo battery.
NOTE: for correct connection between the inverter and batteries, please refer to the relevant
procedure or manual.