33 / 121
User Manual 3000SP
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 16/03/2021 - Application: GID
Figure 28 – Incorrect positioning of the current sensors (CTa reading of the utilities only)
In case of multiple phase cables connected in parallel directly under the import/export meter, make sure
all the phase cables pass through the CTa sensor, as shown in the figure.
Figure 29 – Correct positioning of the current sensors for a system with two separate lines
4.5.
Connecting to the grid
NOTE: If you do not want to configure the EPS (Emergency Power Supply) option, connect the AC power
cable only to the GRID port and leave the LOAD port disconnected.