Perform a Treatment
Treatment
38
BRZ-101-TUM-EN2-L
Set up the Control Unit
►
To set up the control unit:
1.
Position the control unit next to the bed or chair to be used for the treatment.
2.
Ensure that the vents on all four sides of the system have adequate ventilation.
3.
Ensure that the operator can access the power switch easily.
4.
Insert the power plug into a grounded outlet that is labeled Hospital Grade.
To minimize the risk of electric shock, connect this equipment to a
grounded electrical outlet.
5.
Engage the locks on all four casters.
6.
Power on the control unit.
The Applicator? and Card? cues are displayed on the Startup screen.
Attach the Applicator to the Control Unit
These examples show a vacuum applicator.
►
To attach the applicator to the control unit:
1.
Ensure that the support arm is installed on the side of the control unit that will be next to the
treatment bed or chair.
To install the support arm, insert the straight end into the jack.
2.
Place the applicator on top of the control unit.
3.
Position the connector above the connector plate.