Operation
INTRABEAM Water Phantom
Version 6.2
Page 32
G-30-1767-en
Checklist
•
Check your measurement setup using this checklist before you switch on
your INTRABEAM and the XRS_4 starts emitting radiation:
–
The prescribed verifications of the XRS 4 being used were completed suc-
cessfully.
–
The water tank is filled with deionized water up to the upper edge of the
viewing window.
–
The water phantom with the IC ionization chamber has been adapted to
room temperature.
–
The IC ionization chamber is located in the correct measuring chamber.
–
The XRS 4 is seated in the rotary feedthrough without an air gap.
–
The water temperature and air pressure have been measured and record-
ed.
–
Both covers of the water tank are seated exactly in their respective desig-
nated positions.
–
The covers of both measuring chambers are screwed on.
–
The probe tip is positioned exactly.
INTRABEAM 600
The IC ionization chamber is
connected to the “Ion Chamber” port.
The XRS 4 is connected to the XRS cable.
Summary of Contents for INTRABEAM
Page 1: ...ZEISS INTRABEAM Water Phantom Instructions for Use G 30 1767 en Version 6 2 2022 02 24...
Page 4: ...INTRABEAM Water Phantom Version 6 2 Page 4 G 30 1767 en Blank page for your notes...
Page 45: ...Version 6 2 G 30 1767 en Page 45 INTRABEAM Water Phantom Operation Blank page for your notes...
Page 47: ...Version 6 2 G 30 1767 en Page 47 INTRABEAM Water Phantom Operation...
Page 49: ...Version 6 2 G 30 1767 en Page 49 INTRABEAM Water Phantom Operation Blank page for your notes...
Page 74: ...System data INTRABEAM Water Phantom Version 6 2 Page 74 G 30 1767 en Blank page for your notes...
Page 80: ...Index INTRABEAM Water Phantom Version 6 2 Page 80 G 30 1767 en Blank page for your notes...
Page 81: ...Version 6 2 G 30 1767 en Page 81 INTRABEAM Water Phantom Blank page for your notes...