Operation
INTRABEAM Water Phantom
Version 6.2
Page 48
G-30-1767-en
Recording the depth dose curve (INTRABEAM 600)
Position the probe tip in equal steps in the Z axis, moving farther and farther
away from the IC ionization chamber. Measure the depth dose in each new Z
position. Drawing a connecting line between the individual measurements
yields the depth dose curve of the current XRS 4.
•
Actuate the <Fortsetzen> button to reactivate the emission of X-ray radi-
ation.
•
Measure the depth dose in the Z position Z
1
or for r
1
. Start the charge
measurement on the electrometer.
The measurement takes 60 sec.
The measurement result is a charge Q(Z
i
) [C] or Q(r
i
) [C].
•
Position the probe tip in position Z
2
or for r
2
.
•
Restart the charge measurement and then position the probe tip in the
next Z position.
•
To terminate the measurement series, actuate the <Stop> button.
Summary of Contents for INTRABEAM
Page 1: ...ZEISS INTRABEAM Water Phantom Instructions for Use G 30 1767 en Version 6 2 2022 02 24...
Page 4: ...INTRABEAM Water Phantom Version 6 2 Page 4 G 30 1767 en Blank page for your notes...
Page 45: ...Version 6 2 G 30 1767 en Page 45 INTRABEAM Water Phantom Operation Blank page for your notes...
Page 47: ...Version 6 2 G 30 1767 en Page 47 INTRABEAM Water Phantom Operation...
Page 49: ...Version 6 2 G 30 1767 en Page 49 INTRABEAM Water Phantom Operation Blank page for your notes...
Page 74: ...System data INTRABEAM Water Phantom Version 6 2 Page 74 G 30 1767 en Blank page for your notes...
Page 80: ...Index INTRABEAM Water Phantom Version 6 2 Page 80 G 30 1767 en Blank page for your notes...
Page 81: ...Version 6 2 G 30 1767 en Page 81 INTRABEAM Water Phantom Blank page for your notes...