Version 6.2
G-30-1767-en
Page 59
INTRABEAM Water Phantom
Operation
The procedure for inserting the spherical applicator in the water phantom is
explained on page 53.
•
Insert the IC ionization chamber in the measuring chamber for the isotropy
measurement (if this has not already been done).
•
Ensure that the measurement setup has been properly prepared and all re-
quired electrical connections have been made.
•
Leave the positioning in the X and Y axes previously performed for the
measurement of the depth dose curve unchanged.
•
Move the spherical applicator with the X-ray probe upwards (in the Z axis)
until the center of the spherical applicator (i.e. the probe tip) is positioned
roughly centered in front of the measuring chamber for the isotropy me-
asurement.
•
Ensure that the XRS 4 is properly seated in the XRS mount and that all cov-
ers are properly attached to the water tank.
•
Start the radiation generation.
•
Set the electrometer to current measurement. A current value appears on
the electrometer display.
Summary of Contents for INTRABEAM
Page 1: ...ZEISS INTRABEAM Water Phantom Instructions for Use G 30 1767 en Version 6 2 2022 02 24...
Page 4: ...INTRABEAM Water Phantom Version 6 2 Page 4 G 30 1767 en Blank page for your notes...
Page 45: ...Version 6 2 G 30 1767 en Page 45 INTRABEAM Water Phantom Operation Blank page for your notes...
Page 47: ...Version 6 2 G 30 1767 en Page 47 INTRABEAM Water Phantom Operation...
Page 49: ...Version 6 2 G 30 1767 en Page 49 INTRABEAM Water Phantom Operation Blank page for your notes...
Page 74: ...System data INTRABEAM Water Phantom Version 6 2 Page 74 G 30 1767 en Blank page for your notes...
Page 80: ...Index INTRABEAM Water Phantom Version 6 2 Page 80 G 30 1767 en Blank page for your notes...
Page 81: ...Version 6 2 G 30 1767 en Page 81 INTRABEAM Water Phantom Blank page for your notes...