8 - 19
–
+
ELEC
ELECTRIC STARTING SYSTEM
EAS00750
YES
NO
EAS00751
YES
NO
EAS00752
YES
NO
EAS00763
YES
NO
EAS00764
YES
NO
YES
NO
7. Engine stop switch
• Check the engine stop switch for continuity.
Refer to “CHECKING THE SWITCHES”.
• Is the engine stop switch OK?
Replace the right
handlebar switch.
8. Neutral switch
• Check the neutral switch for continuity.
Refer to “CHECKING THE SWITCHES”.
• Is the neutral switch OK?
Replace the neutral
switch.
9. Sidestand switch
• Check the sidestand switch for continuity.
Refer to “CHECKING THE SWITCHES”.
• Is the sidestand switch OK?
Replace the side-
stand switch.
10.Clutch switch
• Check the clutch switch for continuity.
Refer to “CHECKING THE SWITCHES”.
• Is the clutch switch OK?
Replace the clutch
switch.
11.Start switch
• Check the start switch for continuity.
Refer to “CHECKING THE SWITCHES”.
• Is the start switch OK?
Replace the right
handlebar switch.
12.Diode assembly
• Disconnect the diode assembly coupler
from the wire harness.
• Connect the pocket tester (
Ω
×
1) to the
diode assembly coupler as shown.
• Check the diode assembly for continuity.
Positive tester probe
→
sky blue
1
Negative tester probe
→
yellow
2
Continu-
ity
Positive tester probe
→
yellow
2
Negative tester probe
→
sky blue
1
No conti-
nuity
NOTE:
@
When you switch the positive and negative
tester probes, the readings in the above chart
will be reversed.
@
• Are the tester readings correct?
Replace the diode
assembly.
Summary of Contents for VMX12 2001
Page 1: ...VMX12 2001 3LRD AE1 SERVICEMANUAL ...
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 21: ......
Page 22: ...SPEC 2 ...
Page 24: ...SPEC ...
Page 52: ...2 28 SPEC OIL FLOW DIAGRAMS 1 Camshaft 2 Main gallery 3 Crankshaft 4 Oil level switch ...
Page 54: ...2 30 SPEC OIL FLOW DIAGRAMS 1 Crankshaft 2 Oil pipe 3 Oil filter ...
Page 65: ...CHK ADJ 3 ...
Page 125: ......
Page 126: ...ENG 4 ...
Page 130: ...ENG ...
Page 236: ......
Page 237: ...COOL 5 ...
Page 239: ...COOL ...
Page 258: ...CARB 6 ...
Page 260: ...CARB ...
Page 272: ......
Page 273: ...CHAS 7 ...
Page 389: ......
Page 390: ...ELEC 8 ...
Page 396: ...8 4 ELEC SWITCHES ...
Page 417: ...8 25 ELEC STARTER MOTOR 3 Install O rings 1 bolts 2 New T R 5 Nm 0 5 m kg ...
Page 445: ...TRBL SHTG 9 ...