REPLACE VENT BLOCK
(ITEM NO. 39)
Tools:
Slotted Screwdriver; Phillips Screwdriver #2.
Procedure:
1.
DANGER:
Turn off electrical power and disconnect electrical power supply. If unit is
hardwired
CIRCUIT BREAKER MUST BE OFF.
CAUTION:
Utilize care when removing
muffler
in Step 2. Muffler may contain very hot
2.
3.
4.
5.
6.
water.
Remove
muffler
and place in sink.
Lift and remove vent back.
Remove
the seven (7) screws securing Danger Label panel and back panel on either left
or right hand side (servicer preference) and save for reuse. Remove back panel.
Remove weight from weight lifter.
Remove the four (4) screws securing vent block to vent assembly. Remove block, ball (if
NOTES:
Some 4-Head and 6-Head models utilize a stainless steel vent ball (located on vent block)
with weight to regulate pressure.
Each new vent block kit contains replacement screws and a vent block nut plate.
Servicer must use own discretion whether nut plate must be replaced. If nut plate
must be replaced,
remove
the four (4) screws securing vent assembly to rear of fryer
and save for reuse. Remove vent assembly being careful not to apply tension to
vent solenoid wires. Remove defective nut plate and discard. Place new nut plate
on vent tube. Place vent assembly back onto rear of fryer making sure vent tube
protrudes through vent assembly at least 1/2" (See Figure 35). Replace the four (4)
screws securing vent assembly to rear of fryer. If nut plate does not need replacing,
proceed to Step 7.
FIG. 35
WINSTON
57
LIT.6710/REV.0/9-91
applicable) and O-ring.