Installation Drawings
Vertiv
Large System, 3-Phase UPS Battery System Installation Manual
50
Figure 48
Terminal details 625/750kVA UPS to front-terminal battery and attached junction cabinet point-to-point wiring
Table 16
Terminal details 625/750kVA UPS to front-terminal battery and attached junction cabinet point-to-point
interconnect wiring
Run
From
To
Conductor
A1
Battery Cabinet Negative Bus
Junction Negative Bus
Negative DC Power (LH Mount)
B1
Battery Cabinet Positive Bus
Junction Positive Bus
Positive DC Power (LH Mount)
A2
Battery Cabinet Negative Bus
Junction Negative Bus
Negative DC Power (RH Mount)
B2
Battery Cabinet Positive Bus
Junction Positive Bus
Positive DC Power (RH Mount)
D
Junction Positive Bus
UPS Cabinet Positive Bus
Positive DC Power
E
Junction Negative Bus
UPS Cabinet Negative Bus
Negative DC Power
F
Junction Ground
UPS Cabinet Ground
Ground
G
Battery Cabinet Battery Interface Board (BIB)
UPS External Interface Board (EIB)
CAN Control Cables
Attached Junction
Cabinet Right Side
UPS Left Side
Rectifier (Part A)
UPS Left Front
(Part A)
Battery Cabinet
NOTES
1. All power and control wiring between battery
cabinet and junction cabinet is supplied.
2. All power wiring between junction cabinet and UPS
is supplied by others.
3. All control wiring between battery cabinet and UPS
is supplied by others.
Top View
B
A
E
D
F
A
B
C
F
DC (-)
Input
DC (+)
Input
Ground Bus
DC Input
E
D
G
A1
A2
G
B2
A1 & B1
LH Mount
A2 & B2
RH Mount
B1
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...