Battery Installation
Vertiv
|
Large System, 3-Phase UPS Battery System Installation Manual
13
Figure 9
Front-terminal battery system configurations—Liebert NX
™
500-600kVA
Stand-Alone
Interconnected Systems
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
15-½"
Junction
Cabinet
(May be on
either end
or between
any battery
cabinets)
225-400kVA
Stand-Alone
Interconnected Systems
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
62"
(1575mm)
Battery
Cabinet
Liebert
UPS
225-600kVA
One or more battery cabinets
bolted to the UPS
Battery cabinets must be on left
side of UPS.
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...