Figure 49
Terminal details 625/750kVA to front-terminal battery and stand-alone junction cabinet point-to-point wiring
Table 17
Terminal details 625/750kVA to front-terminal battery and stand-alone junction cabinet point-to-point
interconnect wiring
Run
From
To
Conductor
A
Battery Cabinet Negative Bus
Junction Negative Bus
Negative DC Power
B
Battery Cabinet Positive Bus
Junction Positive Bus
Positive DC Power
C
Battery Cabinet Ground
Junction Ground
Ground
D
Junction Positive Bus
UPS Cabinet Positive Bus
Positive DC Power
E
Junction Negative Bus
UPS Cabinet Negative Bus
Negative DC Power
F
Junction Ground
UPS Cabinet Ground
Ground
G
Battery Cabinet Battery Interface Board (BIB)
UPS External Interface Board (EIB)
CAN Control Cables
Stand-Alone
Junction Cabinet
Battery Cabinet
UPS Left Side
Rectifier (Part A)
UPS Left Front
(Part A)
All power and control wiring
is supplied by others.
F
C
E
A
D
B
A
B
C
F
DC (+)
Input
DC (-)
Input
Ground
Bus
DC Input
E
D
G
G
C
TOP VIEW
A
B
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...