![Vertiv Liebert NXL 1100 Installation Manual Download Page 54](http://html1.mh-extra.com/html/vertiv/liebert-nxl-1100/liebert-nxl-1100_installation-manual_1008262054.webp)
Installation Drawings
Vertiv
|
Large System, 3-Phase UPS Battery System Installation Manual
47
Figure 45
Terminal details, Liebert NXL
™
625/750kVA UPS to top-terminal battery and attached junction cabinet,
point-to-point wiring
Table 13
Terminal details, Liebert NXL 625/750kVA UPS to top-terminal battery and attached junction cabinet,
point-to-point wiring
Run
From
To
Conductor
A1
Battery Cabinet Negative Bus
Junction Negative Bus
Negative DC Power (LH Mount)
B1
Battery Cabinet Positive Bus
Junction Positive Bus
Positive DC Power (LH Mount)
A2
Battery Cabinet Negative Bus
Junction Negative Bus
Negative DC Power (RH Mount)
B2
Battery Cabinet Positive Bus
Junction Positive Bus
Positive DC Power (RH Mount)
D
Junction Positive Bus
UPS Cabinet Positive Bus
Positive DC Power
E
Junction Negative Bus
UPS Cabinet Negative Bus
Negative DC Power
F
Junction Ground
UPS Cabinet Ground
Ground
G
Battery Cabinet, Battery
Interface Board (BIB)
UPS External Interface Board (EIB)
CAN Control Cables
TOP VIEW
ATTACHED JUNCTION
CABINET
Right Side
B
A
E
D
F
A
B
C
F
DC (-)
Input
DC (+)
Input
Ground
Bus
DC Input
E
D
G
UPS LEFT SIDE
Rectifier (Part A)
UPS LEFT
Front (Part A)
A2
B2
A1 and B1
LH Mount
A1
B1
A2 and B2
RH Mount
BATTERY CABINET
G
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...