Installation Drawings
Vertiv
Large System, 3-Phase UPS Battery System Installation Manual
36
Figure 33
Attached battery cabinet connections
Figure 34
Ground strap location for connected cabinets
Jumper Busbars
(supplied with battery cabinet)
Jumper Busbars
(supplied with battery cabinet)
Torque to 240in-lb (27 N-M)
Connections cannot be made
if cabinets ordered as stand-alone.
Reference of
corner post of
connected cabinets
Cabinet-to-Cabinet
Bolting Instructions
NOTES
1. Apply ground strap hardware to specified
locations.
2. Torque Values: M6: 40 in-lb (5 Nm)
M10: ( 14 Nm ) 120 in-lb
Typical ground strap installation
for battery cabinet to UPS or ancillary
cabinet connections.
2
2
Front Side
of Units
Front Side
of Units
Typical ground strap installation
for battery cabinet-to-battery cabinet
connections.
Battery
Cabinet
Battery
Cabinet
Battery
Cabinet
1
1
A
B
DETAIL A
DETAIL B
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...