Installation Drawings
Vertiv
|
Large System, 3-Phase UPS Battery System Installation Manual
39
Figure 37
Terminal details Liebert NXL
™
250kVA - 400kVA to front-terminal battery point-to-point wiring
Table 5
Terminal details Liebert UPS 250kVA - 400kVA to front-terminal battery point-to-point interconnect wiring
Run
From
To
Conductors
A1
UPS DC Positive Busbar
Battery Cabinet Positive Bus
Positive DC Power RH Mount /Stand Alone
B1
UPS DC Negative Busbar
Battery Cabinet Negative Bus
Negative DC Power
RH Mount / Stand-Alone
A2
UPS DC Positive Busbar
Battery Cabinet Positive Bus
Positive DC Power Left Mount
B2
UPS DC Negative Busbar
Battery Cabinet Negative Bus
Negative DC Power Left Mount
C*
UPS Ground
Battery Cabinet Ground
Ground
D
UPS External Interface Board (EIB)
Battery Cabinet
Battery Interface Board (BIB)
CAN Control Cables
* For detached units only
BATTERY CABINET
UPS
All power and control wiring is supplied
if units are ordered as attached.
For left-mounted
installations, the DC
cables will be routed
along the interior rear
of the UPS. The cables
can be supported using
lances in the UPS
sheet metal.
UPS - Rear View
DC Bus Connections
D
C
C
A1
B1
A2
B2
A2
B2
A1
B1
D
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...