3. Before Installing the System
Green 16/18 Installation Manual 33
En
glis
h
6.
Put the
Main Unit
with the
EPS (Main Base)
on a Transport Dolly and move it
to the installation site.
When putting the Main Unit on the dolly, make
sure that the center of the mass indicator is
aligned with the center of the dolly.
If you move the unit manually, make sure that the
persons holding the upper handle take the lead.
<Transportation Example>
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...