7. Setting Up PC
Green 16/18 Installation Manual 93
En
glis
h
7.4
Installing the Internal Peripherals
Allow enough time to dissipate remnant energy after
unplugging the power cord from the main outlet or PC.
Disregard this section in case the PC system is supplied
with the equipment. (The peripherals have already been
installed inside the PC.)
Whenever handling the fiber optic frame grabber board:
1.
Wear the anti-static glove.
Do not wear the likes of a thick jacket.
The following figures and descriptions are based on the PC
model Z4 from HP.
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...