Appendix
Green16/18 Installation Manual
147
En
glis
h
4. Before Installation:
Site Check List
Yes
No
Is the room large enough?
At minimum,
with CEPH unit : 2,804 mm (L) x 2,495.8 mm (W) x 2,435 mm
(H) / 111” x 99” x 96”
Without CEPH unit : 2,055 mm (L) x 2,495.8 mm (W) x 2,435
mm (H) / 81” x 99” x 96”
Is the door entrance wider than 800mm (32”)?
Is a radiation protection plan in place?
Do equipment and PC use the same dedicated circuit?
Does the electrical input condition to the installation site meet
the MEIGaN requirements?
Is the local Network IP address of clinic 192.168.33.xx?
Is a compressor or air conditioner suction located right next to
X-ray Room?
Is the floor flat and level?
Is the carpet on the floor? If so, remove it.
Before Opening Boxes
Yes
No
Did the delivery company carry and handle with caution?
Did the installers take pictures of boxes before opening them?
Did the installer make sure there were no suspicious holes or
scratches on the box?
Is the ShockWatch indicator red?
Is the TiltWatch indicator red?
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...