5. Installing the Equipment: Wall Mount
Green 16/18 Installation Manual 77
En
glis
h
5.3.3 Marking Points on the Wall
1. Move the equipment to the installation site as close as possible.
2. Adjust the distance between the wall and equipment by moving it slightly, so
that the wall bracket touches the wall.
3. Mark the anchor bolt locations on the wall.
Marker
n/a
For the wood wall with 16-inch studs, mark the wood
screw locations as shown in the figure.
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...