3. Before Installing the System
30
Green 16/18 Installation Manual
Transportation
1. Pull out the upper and lower carrying handles from
EPS (Main Base)
.
2. Assemble the upper carrying handle by using one wrench bolt.
Wrench Bolt
M8 x 25
(2 Items)
- 1 pc
Allen Wrench
6 mm / 0.24”
The Wrench Bolt is attached to the upper carrying
handle. Remove the bolt from the handle first.
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...