4. Installing the Equipment: Base Stand (Optional)
58
Green 16/18 Installation Manual
4.4
Fixing the Base (Optional)
4.4.1 On the Concrete Floor
Anchor Bolt
5/16 x 60 w/ Spring and Flat Washers
2 pcs
(Part No. 34)
Hammer Drill
L = 200 mm (7.9”)
Hammer
n/a
Ratchet
Wrench
Tips: 3 mm – 8 mm (0.12” – 0.3”)
1. Before installing the equipment, but the base unit on the installation site and
mark 2 locations on the floor
2. Drill the floor holes of size 12 mm x 30 mm (depth) using the concrete hammer
drill.
3. Remove the debris and clean the holes using the dust pump.
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...