4. Installing the Equipment: Base Stand (Optional)
46
Green 16/18 Installation Manual
4. Put the base unit to the column unit by engaging the base holes in the
bolts, as shown in the figure.
Allen Wrench
8 mm / 0.31”
Wrench Bolt
M10 x 25
- 3 pcs
(Part No. 23)
5. Tighten the two wrench bolts.
Allen Wrench
6 mm / 0.24”
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...