4. Installing the Equipment: Base Stand (Optional)
Green 16/18 Installation Manual 65
En
glis
h
4.7
Leveling the Equipment
T-shaped Hex Wench
8 mm / 0.3”
Sprit Level
n/a
4.7.1 Getting Started
To prepare the equipment for the leveling procedure, follow the steps below:
1. Prepare the Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front, as
shown in the figure.
3. Turn all eight screws on the base plate unit clockwise until they touch the
ground.
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...