Model 990 dCLD II Component Leak Detector
4-20
4.7.3 Gauge Calibration
Touch the
GAUGE CAL
box to view the Gauge Calibration screen shown in Figure 4-19.
Figure 4-19 Gauge Calibration Screen
The Gauge Calibration screen displays the spectrometer tube pressure. Use this screen to
calibrate the gauge following the procedure below:
1. With the system running, move to this screen and touch SPEC-TUBE TC ZERO. Verify
that
Passed
appears to the right of TC ZERO.
2. Power off the 990 dCLD II.
3. Loosen the Turbo Vent screw and repower the system.
4. Power on the 990 dCLD II.
5. Move to this screen and touch SPEC-TUBE TC ATM. Verify that
Passed
appears to the
right of TC ATM.
If
Failed
appears after either test, the ConvecTorr gauge must be replaced.
BACK
CALIBRATE
MANUAL
GAUGE
CAL
MANUAL
TUNING
SPEC-TUBE TC ZERO
GAUGE CALIBRATION
BACK
OK
ESC
SPEC-TUBE TC ATM
SPEC-TUBE PRESSURE:
7.6
E +
02
Torr
Summary of Contents for 990 dCLD II
Page 12: ...Model 990 dCLD II Component Leak Detector This page intentionally left blank ...
Page 50: ...Model 990 dCLD II Component Leak Detector This page intentionally left blank ...
Page 128: ...Model 990 dCLD II Component Leak Detector This page intentionally left blank ...
Page 146: ...Model 990 dCLD II Component Leak Detector This page intentionally left blank ...
Page 160: ...Model 990 dCLD II Component Leak Detector This page intentionally left blank ...
Page 161: ......