background image

6.3 

Repair

 

>

Before carrying out repair work, temporarily decommis-
sion the entire photovoltaic installation (

¬

 page 

3

).

 

>

Replace any defective components.

 

>

Do not carry out any repairs in the connection box.

 

>

Start up the photovoltaic installation again (

¬

 page 

5

).

Inspection and maintenance

 

>

Follow the inspection and maintenance plan in the 
appendix.

 

>

Temporarily decommission the photovoltaic installation

 

>

(

¬

 page 

3

).

7.1 

Checking the insulation and stability of the 

cabling

 

>

Check the cabling, insulation and plug connections for 
cleanliness, integrity and stability.

 

>

Document and eliminate all faults.

7.2 

Checking the end and middle clamps

 

>

Check all of the end and middle clamps on the photovol-
taic modules to ensure that they are correctly connected 
to the mounting frame and the PV module frame.

7.3 

Checking the protective earthing

 

>

Check the cabling of the protective earthing for cleanli-
ness, integrity and stability.

7.4 

Completing inspection and maintenance 

work

 

>

Document the inspection work that was carried out in an 
inspection report.

 

>

Point out to the end user that they must always keep the 
inspection report safe.

 

>

Start up the photovoltaic installation again (

¬

 page 

5

).

Decommissioning

8.1 

Permanently decommissioning the 

photovoltaic installation

 

>

Observe the instructions for the inverter.

 

>

Cover the photovoltaic modules with an opaque plastic 
film or a fleece in order to minimise the generation of 
direct current.

8.2 

Removing the photovoltaic module

 

>

Decommission the photovoltaic installation.

 

>

Remove the photovoltaic modules and observe the infor-
mation on the electrical installation and set-up.

Technical data

VPV P 
290/2 M 
SWF

VPV P 
300/2 M 
BBF

VPV P 
305/2 M 
BWF

Nominal output P

nom

290 W

300 W

305 W

Voltage at P

max

 U

mpp

31,3 V

31,2 V

31,4 V

Current at P

max

 I

mpp

9,25 A

9,63 A

9,72 A

Short-circuit current I

sc

9,80 A

9,97 A

10,06 A

No-load voltage V

oc

39,3 V

39,4 V

39,6 V

Dimensions (W x H x D)

990 x 1660 

x 35 mm

990 x 1660 

x 42 mm

990 x 1660 
x 42 mm

Frame height

35 mm

42 mm

Weight

19 kg

Frame material

Al

VPV P 
290/2 M 
SWF

VPV P 
300/2 M 
BBF

VPV P 
305/2 M 
BWF

Connections

Connection box (

2

, image 

2

) with 

three bypass diodes, 4 mm² cable 
and MC4 plug connection. Length 
per pin: 1200 mm (+) (

4

, image 

2

and 800 mm (−) (

3

, image 

2

)

Module efficiency

17,6 %

18,3 %

18,6 %

Current coefficient α

0,05

Voltage coefficient β

−0,29

Power coefficient γ

−0,40 %/K

Maximum permissible sys-
tem voltage U 

max

1000 V

DC

Reverse current capacity

20 A

Pressure load (design 
load)

5400 Pa 

1

7500 Pa 

1

Pressure load (dimension-
ing load) 

2

3600 Pa 

1

5000 Pa 

1

Suction load (design load)

2400 Pa 

1

Suction load (dimension-
ing load) 

2

1600 Pa 

1

Mechanical load in accordance with IEC/EN 61215
1  Observe the installation conditions in the installation instructions
2  Design load/safety factor 1.5 = dimensioning load

This module is rated as application class A in accordance 
with IEC 61730. The electrical performance data can be 
found in the data sheet or on the data plate.

10  Inspection and maintenance work 

– Overview

The table below lists the manufacturer requirements with 
respect to minimum inspection and maintenance intervals. If 
national regulations and directives require shorter inspec-
tion and maintenance intervals, you should observe these 
instead of the intervals listed.

No.

Maintenance work

Interval

1

Checking the end and middle clamps

Annually

6

2

Cleaning the photovoltaic module

Annually

6

3

Checking the installation site

Annually

4

4

Checking the protective earthing

Annually

6

5

Checking the inverter

Annually

-

Installation and maintenance instructions 

6

0020273012_00

Summary of Contents for VPV P 290/2 M SWF

Page 1: ...SWF 0020273300 VPV P 300 2 M BBF 0020273299 VPV P 305 2 M BWF 0020273298 2 1 4 3 1 6 7 5 8 9 2 3 4 5 VPV P en Operating installation and maintenance instructions es Instrucciones de funcionamiento in...

Page 2: ...not carried out at all Have faults and damage eliminated immediately Adhere to the maintenance intervals specified Risk of death caused by missing fall protection Secure people and material against f...

Page 3: ...n W and measurement accuracy toler ance in VMPP Nominal voltage in V IMPP Nominal current in A VOC No load voltage in V ISC Short circuit current in A max Usyst Maximum system voltage in V STC Standar...

Page 4: ...and soft gloves Do not exert tension or pressure on the connection boxes or the cabling 2 2 Storing the photovoltaic module Always store the photovoltaic module in a dry padded location Always store t...

Page 5: ...tant Performance related cross section 4 mm2 Temperature range 40 C 120 C MC4 plug connections 5 image 2 3 4 Series circuit Wire several photovoltaic modules in series schematic diagram image 4 Avoid...

Page 6: ...ominal output Pnom 290 W 300 W 305 W Voltage at Pmax Umpp 31 3 V 31 2 V 31 4 V Current at Pmax Impp 9 25 A 9 63 A 9 72 A Short circuit current Isc 9 80 A 9 97 A 10 06 A No load voltage Voc 39 3 V 39 4...

Page 7: ...s materiales por la realizaci n incorrecta de los trabajos de mantenimiento y reparaci n o por su omisi n Encargue la eliminaci n inmediata de aver as y da os Respetar los intervalos de mantenimiento...

Page 8: ...dulos fotovoltaicos v ase la portada 3 1 Datos en la placa de caracter sticas Dato Significado VPV P 2 Denominaci n de tipo PMPP Potencia calor fica nominal en W con toleran cia de la clasificaci n en...

Page 9: ...los bordes y las esquinas de las placas de cristal Transporte el m dulo fotovoltaico en posici n vertical El m dulo fotovoltaico debe trasladarse entre dos perso nas sujetando por los laterales largos...

Page 10: ...ecci n contra sobreintensidad requerida 3 3 Requisitos para el cableado Sin plastificante Resistente a los rayos UV Secci n transversal con la potencia adecuada 4 mm2 Rango de temperatura 40 C 120 C C...

Page 11: ...instalaci n el ctrica y para el montaje 9 Datos t cnicos VPV P 290 2 M SWF VPV P 300 2 M BBF VPV P 305 2 M BWF Potencia calor fica nominal Pnenn 290 W 300 W 305 W Tensi n a Pmax Umpp 31 3 V 31 2 V 31...

Page 12: ...out moment Tenez vous distance des composants conducteurs Risques de blessures et de dommages mat riels en cas de maintenance ou de r paration n glig e ou non conforme En pr sence d anomalies de fonct...

Page 13: ...ig neusement cette notice ainsi que tous les autres docu ments compl mentaires applicables pour pouvoir vous y r f rer ult rieurement 3 Description du produit Composition du produit vue d ensemble de...

Page 14: ...pointu ou tranchant 2 4 Contr le du contenu de la livraison Quantit D signation 1 Module photovolta que 1 Lot de documentation 2 5 Contr le du ch ssis de montage V rifiez que le ch ssis de montage a b...

Page 15: ...hotovolta ques comme dans le sch ma illustration 4 vitez le montage en boucle illustration 5 3 5 Exigences relatives l onduleur et la mise la terre Reportez vous la notice d installation de l onduleur...

Page 16: ...p 990 x 1660 x 35 mm 990 x 1660 x 42 mm 990 x 1660 x 42 mm Hauteur du cadre 35 mm 42 mm Poids 19 kg Mat riau du cadre Al Raccordements Bo tier de raccordement 2 illustra tion 2 avec 3 diodes bypass c...

Page 17: ...t fall 1 4 Generelle sikkerhetsanvisninger for installat rer Fare p grunn av utilstrekkelige kvalifikasjoner Alt arbeid som er beskrevet i installasjons og vedlikeholds anvisningen m kun utf res av in...

Page 18: ...n Ser No For identifikasjon VDE kontrolltegn 3 2 Serienummer Serienummeret er angitt p et skilt p siden p produktet og p et skilt ved siden av typeskiltet 1 bilde 1 3 3 CE merkingng CE merkingen dokum...

Page 19: ...komponenter 2 10 Montering av solcellemodulen 2 10 1 V r oppmerksom p klemmeflaten b a 6 a Klemmelengde minst 30 mm b Klemmedybde 3 7 mm S rg for tilstrekkelig stor klemmelengde og klem medybde p sol...

Page 20: ...du utelukkende bruke reservedeler som er god kjent for produktet 6 3 Reparasjoner Ta hele solcelleanlegget midlertidig ut av drift side 18 f r Skift ut defekte komponenter Ikke utf r reparasjoner i k...

Page 21: ...lassifisert for bruksklasse A i henhold til IEC 61730 De elektriske effektdataene finner du i databla det eller p typeskiltet 10 Inspeksjons og vedlikeholdsarbeid oversikt Tabellen nedenfor inneholder...

Page 22: ...a a 22 0020273012_00 1 1 1 3 4 1 2 IP 1 3 1 4 1 5...

Page 23: ...ar 0020273012_00 23 2 2 1 2 2 3 3 1 VPV P 2 PMPP VMPP IMPP VOC ISC max Usyst STC IR IP 67 II class C Control No Ser No VDE 3 2 1 1 CE 3 3 4 5 5 1 23 5 2 5 3 6 6 1 7 8 Country Specifics...

Page 24: ...24 0020273012_00 1 2 2 1 2 2 2 4 1 1 2 5 9 7 8 2 6 A 2 7 A 2 8 24 2 9 2 10 2 10 1 b a 6 7 3 b 30 a 2 10 2 3 3 3 1 6 2 25 i Isc 1 25 Voc 2 8 9 1 2 3 2 3 3 2 4 120 40 2 5 MC4 3 4 4 5 3 5 2 7 2 9...

Page 25: ...Pmax Umpp 9 72 A 9 63 A 9 25 A Pmax Impp 10 06 A 9 97 A 9 80 A Isc 39 6 V 39 4 V 39 3 V Voc 990 x 1660 x 42 mm 990 x 1660 x 42 mm 990 x 1660 x 35 mm x x 42 mm 35 mm 19 kg Al 2 2 2 4 1200 MC4 3 800 2 4...

Page 26: ...00 200 II 430 430 200 200 430 430 b c a 1 2 III 120 120 310 310 3 200 200 3 IV 210 210 140 140 3 200 200 3 a a a 250 40 3 4 V a a a 250 40 3 4 42 mm Product with 42 mm frame Producto con marco de 42 m...

Page 27: ...IV Pressure up to 5400 Pa approx 540 kg m suction up to 2400 Pa approx 240 kg m Nivel de carga IV pre si n hasta 5400 Pa aprox 540 kg m succi n hasta 2400 Pa aprox 240 kg m Niveau de charge IV pressio...

Page 28: ...28 0020273012_00 9...

Page 29: ...nte Pol Industrial Apartado 1 143 C La Granja 26 28108 Alcobendas Madrid Tel fono 9 02116819 Fax 9 16615197 www vaillant es 3 GB United Kingdom Vaillant Ltd Nottingham Road Belper Derbyshire DE56 1JT...

Page 30: ......

Page 31: ......

Page 32: ...3012_00 EGESGBNOTN 032018 Subject to technical modi cations Reservado el derecho a introducir modi caciones t cnicas Sous r serve de modi cations techniques Med forbehold om tekniske endringer 0020273...

Reviews: