D292105.8b.fm
Preparing to Run a Pre-programmed Job
Chapter 6: Operation
6- 9
Setup the Pick Head
1.
Ensure the correct
Nozzle
and
Nozzle Tip
are installed for the job that will be run.:
Note:
See the
Chapter 4: Setup
for nozzle
change procedures.
2.
Open the
Head Tab
on the HMI.
Step 6:
Setup
Pick Head