10.ARITHMETICS
156
10-11. Initial Control Rate
[%]
If [START COORDIN. VALUE] parameter is set to zero, the initial control rate is
calculated using set values from AT COORDINATE 1-4 and AT COORDIN OUT 1-4.
If [START COORDIN. VALUE] is set to non-zero value, the following relation holds:
Initial control rate [%] = start coordin. value [%]
10-12. Control Deviation
Flow ([t/h], [kg/h])
Control rate [%]
0
f1
c4
c3
c2
c1
f2
f3
f4
f1 - f4: AT COORDINATE 1-4
c1 - c4: AT COORDIN OUT 1-4
Initial control
Equivalent Target
rate
Ctrl. Deviation
=
Equivalent target ([kg/h], [t/h])
× 100
Feed rate ([kg/h], [t/h])
-
Equivalent target ([kg/h], [t/h])