Viii. Electrical
(continued)
F. Multiple Boiler Wiring
1. Install over-current protection
in accordance
with authority having jurisdiction or, in the absence
of such requirements, follow the National Electric
Code, NFPA 70, and/or Canadian Electrical Code
Part 1, CSA C22.1. Do not provide over-current
protection greater than 15 amperes. If it becomes
necessary to provide greater amperes (because of
the number of boilers provided) use separate circuits
and over-current protection for additional boilers.
2. Required Equipment and Setup
a. Header Sensor (P/N 101935-01 or 103104-01)
A header sensor must be installed and wired to
the Sequencer Master boiler. The header sensor
is installed on the common system piping and
provides blended temperature information to
the Sequence Master. Refer to Figure 34 for
installation location and Figure 32 or 33 for
installation detail.
b. Ethernet Cables
Ethernet cables are used to connect the boiler
network together. These are standard “straight
through” cables that can be purchased at
electrical distributors.
Alternately, the network can be wired together by
simply wiring Modbus Boiler-to-Boiler terminals
A, B, and C between each boiler. Refer to
Figures 40, 41, 44 and 45 for wiring location.
G. External Multiple Boiler Control System
As an alternate to the control internal sequencer, the control
also accepts an input from an external sequencer. Follow
multiple boiler control system manufacturer (Honeywell,
Tekmar, etc.) instructions to properly apply a multiple
boiler control system. The Tekmar Model 264 and Model
265 based control wiring diagrams (Figures 45 and 46) are
provided as examples of typical multiple boiler control
systems.
Summary of Contents for Alpine ALP500C
Page 48: ...48 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only ...
Page 62: ...62 Figure 40 Ladder Diagram VIII Electrical continued ...
Page 63: ...63 VIII Electrical continued 2 Figure 41 Wiring Connections Diagram ...
Page 72: ...72 IX System Start up continued Figure 48 Operating Instructions ...
Page 124: ...124 XIII Repair Parts continued ...
Page 126: ...126 XIII Repair Parts continued ALP600C ALP700C and ALP800C ALP800C shown ...
Page 130: ...130 XIII Repair Parts continued ...
Page 133: ...133 XIII Repair Parts continued 10A 10B 10C 10D 10G ...
Page 143: ...143 ...
Page 144: ...144 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...