![U.S. Boiler Company Alpine ALP500C Installation, Operating And Service Instructions Download Page 109](http://html1.mh-extra.com/html/u-s-boiler-company/alpine-alp500c/alpine-alp500c_installation-operating-and-service-instructions_3111317109.webp)
109
Xi. Service and Maintenance
Important Product Safety Information
Refractory Ceramic Fiber Product
WARNING
The Repair Parts list designates parts that contain refractory ceramic fibers
(RCF). RCF has been classified as a possible human carcinogen. When
exposed to temperatures above 1805°F, such as during direct flame contact,
RCF changes into crystalline silica, a known carcinogen. When disturbed as a
result of servicing or repair, these substances become airborne and, if
inhaled, may be hazardous to your health.
AVOID Breathing Fiber Particulates and Dust
Precautionary Measures
:
Do not remove or replace RCF parts or attempt any service or repair work
involving RCF without wearing the following protective gear:
1. A National Institute for Occupational Safety and Health (NIOSH)
approved respirator
2. Long sleeved, loose fitting clothing
3. Gloves
4. Eye Protection
•
Take steps to assure adequate ventilation.
•
Wash all exposed body areas gently with soap and water after contact.
•
Wash work clothes separately from other laundry and rinse washing
machine after use to avoid contaminating other clothes.
•
Discard used RCF components by sealing in an airtight plastic bag. RCF
and crystalline silica are not classified as hazardous wastes in the United
States and Canada.
First Aid Procedures
:
•
If contact with eyes: Flush with water for at least 15 minutes. Seek
immediate medical attention if irritation persists.
•
If contact with skin: Wash affected area gently with soap and water.
Seek immediate medical attention if irritation persists.
•
If breathing difficulty develops: Leave the area and move to a
location with clean fresh air. Seek immediate medical attention if
breathing difficulties persist.
•
Ingestion: Do not induce vomiting. Drink plenty of water. Seek
immediate medical attention.
Summary of Contents for Alpine ALP500C
Page 48: ...48 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only ...
Page 62: ...62 Figure 40 Ladder Diagram VIII Electrical continued ...
Page 63: ...63 VIII Electrical continued 2 Figure 41 Wiring Connections Diagram ...
Page 72: ...72 IX System Start up continued Figure 48 Operating Instructions ...
Page 124: ...124 XIII Repair Parts continued ...
Page 126: ...126 XIII Repair Parts continued ALP600C ALP700C and ALP800C ALP800C shown ...
Page 130: ...130 XIII Repair Parts continued ...
Page 133: ...133 XIII Repair Parts continued 10A 10B 10C 10D 10G ...
Page 143: ...143 ...
Page 144: ...144 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...