![U.S. Boiler Company Alpine ALP500C Installation, Operating And Service Instructions Download Page 30](http://html1.mh-extra.com/html/u-s-boiler-company/alpine-alp500c/alpine-alp500c_installation-operating-and-service-instructions_3111317030.webp)
30
iV. Venting
C. Polypropylene Venting (continued)
nOTiCE
Pressure drop for flexible polypropylene liner
is 20% greater than from rigid pipe. Multiply
measured flexible polypropylene liner length by
1.2 to obtain equivalent length.
Maximum equivalent length of flexible
polypropylene liner is 48 ft. (14.6 m).
a. Models ALP399C and ALP500C are listed for
vertical venting by installing flexible vent in an
UNUSED masonry chimney/chase and supplying
combustion air through a separate wall or roof
combustion air terminal.
b. Refer to Figure 21 for details of chimney chase
installation.
c. Flexible polypropylene pipe must be treated
carefully and stored at temperatures higher than
41°F (5°C).
d. Do not bend or attempt to install flexible pipe if
it has been stored at lower ambient temperature
without allowing the pipe to warm up to a higher
temperature first.
Warning
asphyxiation Hazard. Bending or attempting
to install flexible pipe if it has been stored at
ambient temperature below 41°F (5°C) will
cause material to become brittle and lead to
cracks, resulting in flue gas leaks.
Do not install flexible polypropylene pipe
at an angle greater than 45 degrees from
vertical plane when used for combustion
product venting. Failure to do so will result
in improper condensate drainage towards
the boiler and possible subsequent vent
pipe blockage.
e. When flexible polypropylene pipe (liner) is used
for combustion product venting, it must not be
installed at an angle greater than 45 degrees from
vertical plane. This will insure proper condensate
flow back towards the boiler.
f. When flexible polypropylene pipe (liner) is used
for combustion air supply to a boiler, the pipe
(liner) can be installed in vertical or horizontal
position.
g. Follow flexible polypropylene pipe (liner)
manufacturer specific installation instructions
regarding application/listing, permits, minimum
clearances to combustibles, installation details
(proper joint assembly, pipe support and routing,
gasket and fitting installation, optional tooling
availability/usage, routing through masonry
Boiler Model
n
ominal Pipe
Diameter
Pipe Joint Locking Band Clamp
Combustion
a
ir
Vent
Ipex Low Profile
Termination a
dapter & Wall Plate
Boiler adapter
Sidewall
Termination:
UV
r
esistant 90°
Elbow w/Screen
r
oof
Termination:
(2) UV
r
esistant
90° Elbows w/Screen
Boiler adapter
Sidewall * or
r
oof
Termination: UV resistant Straight
Pipe w/Screen
Flex
Chimney Lining Kit
ALP399C (reduced dia.) ALP500C (reduced dia.)
3 in.
(80 mm)
2ZDLC3
2ZDCPVC4
with
2ZDR43
Elbow: 2ZDE387UV
Screen: 2ZDES3
Elbow: 2ZDE387UV
Screen: 2ZDES3
2ZD144 with
2ZDR43
Pipe: 2ZDP3(*) UV
Screen: 2ZDES3
2ZDFK325
or
2ZDFK335
N/A
ALP399C (standard dia.) ALP500C (standard dia.)
ALP600C (reduced dia. vent) ALP700C (reduced dia. vent) ALP800C (reduced dia. vent)
4 in.
(100 mm)
2ZDLC4
2ZDCPVC4
Elbow: 2ZDE487UV
Screen: 2ZDES4
Elbow: 2ZDE487UV
Screen: 2ZDES4
2ZD144;
ALP600C, ALP700C, & ALP800C:
2ZDCPVCCG6 with 2ZDR65 & 2ZDR54
Pipe: 2ZDP4(*)
Screen: 2ZDES4
2ZDFK425
or
2ZDFK435
N/A
ALP600C standard dia. vent) ALP700C standard dia. vent) ALP800C standard dia. vent)
6 in.
(150 mm)
2ZDLC6
2ZDCPVC4
Elbow: 2ZDE687
Screen: 2ZDES6
Elbow: 2ZDE687
Screen: 2ZDES6
2ZDCPVCCG6
Pipe: 2ZDP6(*)
Screen: 2ZDES6
N/A
N/A
* n
ote:
When using room air for combustion, use UV resistant 90° elbow or tee for sidewall vent termination. UV resistant 90° elbow part numbers: 2ZDE387UV (3 in.), 2ZDE487UV (4 in.), 2ZDE687UV (6 in.).
UV resistant tee part numbers: 2ZDTT3 (3 in.), 2ZDTT4 (4 in.), 2ZDTT6 (6 in.).
See Z-Flex Z-Dens literature for other required component part numbers such as straight pipe, elbows, firestops and vent supports.
(*) - Pipe Length
Table 18: Listed Polypropylene Pipe, Fittings and T
erminations - Z-Flex Z-Dens
Summary of Contents for Alpine ALP500C
Page 48: ...48 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only ...
Page 62: ...62 Figure 40 Ladder Diagram VIII Electrical continued ...
Page 63: ...63 VIII Electrical continued 2 Figure 41 Wiring Connections Diagram ...
Page 72: ...72 IX System Start up continued Figure 48 Operating Instructions ...
Page 124: ...124 XIII Repair Parts continued ...
Page 126: ...126 XIII Repair Parts continued ALP600C ALP700C and ALP800C ALP800C shown ...
Page 130: ...130 XIII Repair Parts continued ...
Page 133: ...133 XIII Repair Parts continued 10A 10B 10C 10D 10G ...
Page 143: ...143 ...
Page 144: ...144 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...